Asphalt Sealcoating in Lees Summit, MO
Gorman Sealcoating and Striping recently resealed the parking lot for an office park located at 211 Executive Way in Lee's Summit, Missouri. The process began with cleaning the entire surface using high-powered blowers and steel bristle brooms. Next, 350-degree hot sealant was applied to the major cracks, followed by sealing the entire surface with Mac micro pave sealer. Once the sealer was dry, parking lines and handicap markings were reapplied. Regular cleaning and inspection of the pavement to identify any cracks or potholes that need to be repaired before sealcoating is important to ensure the quality and longevity of the project. Structural repairs should be completed before sealcoating, and the pavement should be allowed to cure for at least 12 months before applying sealcoat. It is recommended To use high-quality asphalt sealant for optimum performance.
Project Details
- Service Used: Asphalt Sealcoating
- Project location: Lees Summit, MO
Asphalt Sealcoating in Lees Summit, MO - Gallery
Lees Summit, MO